切换到中文版(Chinese Version) Repair and Maintenance Materials Needed for Road TEl: (+86)15954977877
HUATONG
PRODUCT CENTER
TEL
86-0535-8956399

TEL:

86-0535-8956399
TEL:+86 535 8956399
E-mail:Ella@yantaihuatong.com
sales@yantaihuatong.com
lisa@yantaihuatong.com
Address:Zoujia Village, Donglai street, Longkou city, Shandong Province, China.

Technical

Position:Home > Technical >

solidifies slowly--cold mix asphalt

Time:2018/08/01 Hits:
It will take about 7 days to solidify completely because of various additives in cold mix asphalt, such as diesel oil. The potholes surface will be out of shape and appear wheel ruts if open traffic immediately after repair. As long as the cold mix asphalt is not be taken away by car tyres, you don’t have to deal with. It is the normal phenomenon and the main distinction from cold mix asphalt and hot asphalt mixture.
The cold mix asphalt will slowly solidify and form smooth within 7 days. Even if the wheel ruts occurs, it will be smooth itself due to the adhesion, plasticity, and wheel tyres compaction.