切换到中文版(Chinese Version) Repair and Maintenance Materials Needed for Road TEl: (+86)15954977877
HUATONG
PRODUCT CENTER
TEL
86-0535-8956399

TEL:

86-0535-8956399
TEL:+86 535 8956399
E-mail:Ella@yantaihuatong.com
sales@yantaihuatong.com
lisa@yantaihuatong.com
Address:Zoujia Village, Donglai street, Longkou city, Shandong Province, China.

Technical

Position:Home > Technical >

How to store cold mix asphalt?

Time:2018/08/07 Hits:
storage in indoor ventilation or outdoors without covering. Away from inflammable and highly oxidized materials. The newly produced cold mix asphalt cannot be used directly, it  needs to be put on hold fro 24 hours . If construction in low temperature, please put the cold mix asphalt into the warehouse firstly for 24 hours.  The temperature of warehouse should be above  5 ℃.